News Flash Home
The original item was published from 8/6/2018 10:55:21 AM to 8/17/2018 3:37:00 PM.

News Flash

Home - Traffic Alerts

Posted on: August 6, 2018

[ARCHIVED] Burd Road

Resurfacing will be accomplished by first removing the existing pavement surface by milling with a milling machine.  Driving on milled surfaces is permitted.  

After milling, distressed areas of the pavement will be repaired. This will be followed by the placement of a new 2” thick layer of hot mix asphalt. During this placement process there will be restricted access to the road and driveways.   Restrictions could last up to 1 hour depending on weather conditions. Contractor personnel on-site will help direct you during these restrictions.

Roads will be open to emergency vehicles, garbage trucks, mail vehicles and local traffic at all times.  

Please use caution on milled pavement as there may be loose gravel and irregularities in the surface and bicycle riding, walking and running will be challenging.

The Township and Earle Asphalt thank you in advance for your cooperation during these much needed improvements.

Questions?  Please call Van Cleef Engineering Associates 609-689-1100.              

Facebook Twitter Email

Other News in Home - Traffic Alerts